Dubai civil defence inspection
In order to attain a final completion certificate, Dubai civil defense inspector will come and inspect the site. If everything is ok, they will provide final completion certificate. DCD provides industrial and commercial establishments with the necessary safety and security to protect lives. Various services are approved by Dubai Civil Defense under the name Dubai Civil Defense Approval.
- Points to remember in Dubai civil defence inspections
• It is important that all fire dampers are set in the open position to allow normal airflow through them.
• Check that the building and work areas are adequately illuminated; make sure the light fittings are in good
working order and provide adequate illumination.
• Ensure that all fire sprinklers are free of obstructions, such as obstructions, paint, and debris, which could obstruct water flow.
• In false ceilings and walls, fire alarm systems should be mounted and functional.
• Check extraction fans and makeup fans for appropriate airflow, and make sure they are running according to
specifications.
• All security and exit doors should be installed prior to inspection.
• No storage should be located in any stall areas and should be removed.
• sufficient light for the designated area.
• All exits located in basements areas should be illuminated, directional illuminated arrows should be placed in
strategic locations that can be easily seen by anyone on foot.
- List Of Documents For Dubai Civil Defence Inspection
1. Copy of Building valid “AMC” (Annual maintenance contract)
2. Equipment supply and Installation Certificate for Fire Sprinkler
3. Equipment Warranty certificate for Fire Sprinkler
4. Equipment supply and Installation Certificate for Smoke detector & Heat detector.
5. Equipment Warranty certificate for Smoke detector & Heat detector.
6. Equipment supply and Installation Certificate for Emergency and Exit lights.
7. Equipment Warranty certificate for Emergency and Exit lights
8. Fire alarm testing and commissioning report
9. Fire sprinkler commissioning report
10. Cable certificate
11. Warranty certificate
12. Fire alarm Interface connection certificate (for newly installed addressable FACP)
13. Fire rated Parquet flooring certificate if there is wooden parquet flooring Works
14. FACP Documents (If applicable)
15. 24/7 payment receipt
1. Fit out permit (Legal translated)
2. DCD approved drawing
3. Copy of DCD fire code invoice
4. Final approval from DCD
5. Copy of P.R.O card (Delegate card)
6. Trade license copy of contractor
7. 6 pages of application typed in Arabic language
8. Green file