Having perfect grooming throughout their life is something every person strives for. Thus, people seek grooming services for looking beautiful in the form of haircuts, manicures, and pedicures. It is for this reason that beauty salons are currently in high demand. Because of this, urban areas are full of beauty salons. Wouldn’t it be great to open a beauty salon in such a place, wouldn’t it? Wouldn’t that be a good idea?
Dubai Municipality Approval For Salon
A number of factors contribute to Dubai’s high quality of life as well as its high disposable
income per capita.Thus, if you wish to maintain your appearance, you must be prepared to
spend a considerable amount of money. As a result of these factors, it is clear that purchasing a
salon business is a better investment since you will also get a better return.
It is a fact that many people do not have a clear understanding about how to open a salon for men or for women in Dubai. During this discussion, we will be able to provide information about the requirements that need to be met for opening a salon in Dubai in detail.
- A salon’s approval in UAE is subject to the following requirements
• Your salon location needs to be approved by the planning department of Dubai Municipality.
• Besides having sufficient lighting, the salon should have clean, appropriate furniture.
• There should be at least 3.5 m of length and 3.0 m of width for the dressing chairs in the salon.
• A beauty salon should have at least 2.30 meters of space between its floor and its ceiling.
• Besides having sufficient lighting, the salon should have clean, appropriate furniture.
• There should be at least 3.5 m of length and 3.0 m of width for the dressing chairs in the salon.
• A beauty salon should have at least 2.30 meters of space between its floor and its ceiling.
• The preparation area for the hair removal materials should be equipped with fireproofing materials as
one of the essential features of the salon. There must also be a water heater and cabinets or drawers to
store cosmetics and towels. Near the facial treatment area, there should also be a washbasin.
• In addition to hair removal, manicures, and pedicures, you should have a separate area for these treatments. It should have a minimum size of 2.50m x 1.50m and should be partitioned properly.
• In addition to hair removal, manicures, and pedicures, you should have a separate area for these treatments. It should have a minimum size of 2.50m x 1.50m and should be partitioned properly.
Documents for DM approval (salon)
List of Drawing to DM Cover sheet
List of Drawing to DM Mechanical
Documents for DM approval (salon)
• Trade license copy of Tenant (or Trade Name reservation + Initial trade license copy)
• Copy of RERA (Ejari)
• NOC from Building owner/real estate/management
• Affection plan (plot drawing)
• DM approved existing drawing (municipality stamped drawing(as built))
• Copy of RERA (Ejari)
• NOC from Building owner/real estate/management
• Affection plan (plot drawing)
• DM approved existing drawing (municipality stamped drawing(as built))
List of Drawing to DM Cover sheet
• Key plan (high light our unit with rev-cloud)
• Existing floor plan
• Proposed floor plan
• Flooring layout (e.g.:-ceramic, parquet, carpet…)
• Ceiling layout (e.g.:- 60×60 gypsum tile, plain gypsum, aluminum…..etc.)
• Seating and equipment layout
• Section (internal height from floor to soffit and floor to false ceiling)
• Existing floor plan
• Proposed floor plan
• Flooring layout (e.g.:-ceramic, parquet, carpet…)
• Ceiling layout (e.g.:- 60×60 gypsum tile, plain gypsum, aluminum…..etc.)
• Seating and equipment layout
• Section (internal height from floor to soffit and floor to false ceiling)
List of Drawing to DM Mechanical
• Existing HVAC layout (showing FCU and Fresh air)
• Proposed HVAC layout (showing FCU details,Ducting,VCD,CFM,duct Size,…and Fresh air details)
• Existing drainage layout (showing nearest connection)
• Proposed drainage layout (including pipe size, floor trap, hand wash, toilet,…etc.)
• Proposed HVAC layout (showing FCU details,Ducting,VCD,CFM,duct Size,…and Fresh air details)
• Existing drainage layout (showing nearest connection)
• Proposed drainage layout (including pipe size, floor trap, hand wash, toilet,…etc.)
- Gallery